News Center


News List

  • Journal Of Rock Mechanics And Geotechnical Engineering

    M saadat et al journal of rock mechanics and geotechnical engineering 6 2014 6776 table 1 blasting parameters of geg iron ore mine explosive type blast hole pattern bench height m hole diameter m rows per blast holes per row anfo staggered 15 0203 27 1020 is capable of extracting the relation between inputs and outputs of a

  • Geotechnical Considerations For The Stability Of Open Pit

    In addition she has performed a planning and management role for geotechnical studies and design outcomes for the iron ore operations of a mining major in western australia diane has also conducted geotechnical soils investigations and site characterisation for civil and mining infrastructure projects

  • Open Pit Geotechnics Slope Stability Mine Design

    In addition she has performed a planning and management role for geotechnical studies and design outcomes for the iron ore operations of a mining major in western australia diane has also conducted geotechnical soils investigations and site characterisation for civil and mining infrastructure projects

  • Nurizon Consulting Geotechnical And Pavements Solutions

    Nimba iron ore guinea and liberia may 2014 dec 2015 project preliminary mine haul road design and geotechnical investigation sable mining africa ltd obtained an iron ore mining concession in the mount nimba region of the republic of guinea with phase 1 of the project comprising the extraction of 3mtpa dso direct shipping ore from the concession area

  • Risk Based Geotechnical Slope Reconciliation At Rio

    Ra dixon senior geotechnical engineer rio tinto iron ore when estimating input parameters for geotechnical slope design multiple ore pods resulting in multi pit mines where a number

  • Geotechnical Considerations For The Stability Of Open Pit

    This paper presents examples of several scenarios in which pit slope stability assessment may be required at mine closure these are focused specifically on the longterm stability of the open pit excavations not the stability of any adjacent structures the paper does not attempt to propose a set of guidelines but discusses techniques that may be used for assessment under various scenarios

  • Iron Ore Wikipedia

    Increasing iron ore demand coupled with the depletion of highgrade hematite ores in the united states after world war ii led to development of lowergrade iron ore sources principally the utilization of magnetite and taconite ironore mining methods vary by the type of ore being mined

  • The Role And Importance Of Geotechnical Engineering For A

    Oct 08 2019 lets consider few examples of the mine design improvements through geotechnical engineering open pit mining the value of open pit mining operation is primarily driven by ore vs waste strip ratio the less waste to move to extract ore the higher the revenue that open pit mine generates

  • Improving Performance Through Benchmarking Iron Ore

    Improving performance through benchmarking srk russia was engaged by a local client to review several of its iron ore operations open pit and underground to determine what increases in capacity could be achieved through removing bottlenecks in its current operations

  • Home Redrockgeo

    Multidisciplinary extensive experience in geology geomechanics and geotechnical engineering for gold base metals industrial minerals and iron ore in a wide range of environments and cultures from the tropical highlands of papua new guinea to the great sandy desert of western australia

  • Geotechnical Milestones At Mount Lyell Mine Ausimm

    The prince lyell orebody at mount lyell mine has a rich mining history commencing with the open pit in 1935 which transitioned underground in 1972 between 1972 and 2014 a total of 64 mt was mined underground as the mine extended from 210 m to 1100 m below surface as

  • Geotechnical Considerations For Mining Method Selection

    Geotechnical considerations for mining method selection of a potential underground iron ore mine in mideastern turkey levend tutluoglu celal karpuz hasan ozturk dogukan guner and a gunes yardimci middle east technical university ankara turkey abstract

  • Geotechnical Properties Of Mine Tailings Journal Of

    The required input parameters for such numerical simulation are generally obtained from laboratory tests an iron mine in yuhezhai yunnan china and a copper mine in bahuerachi mexico are going to be constructed and the plan is to dispose of produced tailings in tailing reservoirs

  • Piop Flinders Mines

    The piop commenced in may 2003 as a joint venture between flinders diamonds limited now flinders mines limited and prenti exploration pty ltd prenti in march 2005 flinders and prenti agreed with fortescue metals group fmg to swap commodity rights on some of the piop tenements with fmg taking the iron ore rights

  • Geotechnical Considerations For Mining Method Selection

    Geotechnical analysis plays an important role in determining mining method selection this study presents the geotechnical design analysis of a potential ug iron ore mentes mine at yahyali province of kayseri district in turkey iron ore body is initially planned to be mined by using long hole mining

  • Nurizon Consulting Geotechnical And Pavements Solutions

    Nimba iron ore guinea and liberia may 2014 dec 2015 project preliminary mine haul road design and geotechnical investigation sable mining africa ltd obtained an iron ore mining concession in the mount nimba region of the republic of guinea with phase 1 of the project comprising the extraction of 3mtpa dso direct shipping ore from the concession area

  • Geotechnics For Mining And Civil Infrastructure Srk

    In addition she has performed a planning and management role for geotechnical studies and design outcomes for the iron ore operations of a mining major in western australia diane has also conducted geotechnical soils investigations and site characterisation for civil and mining infrastructure projects

  • Geotechnical Properties Of Mine Tailings Asce Library

    Of tailing dams the required input parameters for such numerical simulation are generally obtained from laboratory tests an iron mine in yuhezhaiyunnan chinaand a coppermine in bahuerachi mexico are going to be constructed and the plan is to dispose of produced tailings

  • Mapping Surface Deformation In Open Pit Iron Mines Of

    Jul 02 2015 mafics are country rocks of the iron ore which are normally covered by lateritic duricrusts based on geotechnical parameters the mining nomenclatures for mafics are unweathered mafic weathered mafic with inferior resistance weathered mafic with medium resistance weathered mafic with superior resistance and semiweathered mafic

  • Influence Of Laboratory Techniques On The Geotechnical

    This paper presents results of an extensive laboratory program executed to obtain geotechnical parameters of mining and industrial wastes different residues from mining and industrial processing of bauxite were studied the results of geotechnical characterization tests carried out on all materials are presented and compared

  • Pilbara Iron Ore Project Epa Wa

    Flinders mines limited pilbara iron ore project geotechnical desk study l20100000501 flinders mines project pfs100 engineeringgeomatics01documentation06 reports201000005012000cirep0001

  • Key Geotechnical Characterisation Parameters

    Figure 5 shows a comparison of selected geotechnical parameters from drillholes intercepting a pit wall through a deeply weathered profiles using leapfrog geo 3d software figure 5 shows the variability in the geotechnical parameters as expected for a rock in the very poor to good rock quality rmr range bieniawski 1989 5

  • Slope Design And Implementation In Open Pit Mines

    The analysis of geological structures and geotechnical parameters of the considered material as well as analysis of mechanical stresses generated by the mining excavation lead to identify the most critical mechanisms of deformation and failure in general the simplification of these critical mechanisms using homogenization and

  • Geotechnical Characterisation And Design Processes For

    Mass geotechnical logging parameters gathered on site are dependent on the classification system to be applied for the geotechnical design requirements rock mass rating system rmr mining rock mass rating system mrmr as well as geological strength index gsi are used however the addition of the insitu rock mass rating system irmr and